Local Workers Moving Penstock
Constructing the Gariuai Mini Hydroelectric Power Project was done using local manual labour, with few exceptions. Here local workers move a 250 mm (smaller) penstock section (high pressure water pipes) into the ditch they have excavated by hand.
Gariuai, Baucau, East Timor — 26 March 2008 — ref 20080326-851

